Graminha (Caçonde)
| State |
Caconde-SP |
| River name |
Grande |
| sub-basin name |
Pardo |
| Company name |
AES Tietê S.A. |
| Latitude |
21°34'37"S |
| Longitude |
46°37'28"W |
| Construction Period |
1966 |
| Total installed power(MW) |
80 |
| Destination of Energy |
PIE |
| Historical Maximum discharge(m3/s) |
|
| Mean discharge (m3/s) |
|
| Historical minimum discharge (m3/s) |
|
| Basin area (km2) |
|
| maximum operational water level (m) |
855.00 |
| extreme maximum water level (m) |
|
| operational water level (m) |
|
| minimum operational water level (m) |
825.5 |
| Total volume (m3) |
|
| Net volume (m3) |
540,000,000 |
| Length (km) |
|
| Surface area at normal condition (km2) |
31 |
| Downstream water level(maximum) (m) |
|
| Downstream water level(normal) (m) |
|
| Downstream water level(minimum) (m) |
|
| Height of the spillway outlet (m) |
|
| Height of the main dam (m) |
60 |
| Length of the main dam(m) |
450.00 |
| Vaciemiento máximo / Capacidad de descarge del vertedor (m3/s) |
|
| Tipo |
|
| Número de Compuertas Total |
2 |
| superfície |
|
| Base |
|
| Largo (m) |
|
| Altura (m) |
105 |
| Cota del tipo de ogiva |
|
| Longitud de la cresta (m) |
|
| Número de unidades instaladas |
2 |
| Potencial nominal (MW) |
41.2, 39.2 |
| Tipo |
Francis |
| Ancho Total (m) |
|
| Largo Total (m) |
|
| Desnível (m) |
|
| Referencia |
|
| Otro información |
|