| State | Piraju-SP |
|---|---|
| River name | Parana |
| sub-basin name | Paranapanema |
| Company name | CBA |
| Latitude | 23°9'18"S |
| Longitude | 49°22'47"W |
| Construction Period | 2002 |
| Total installed power(MW) | 80 |
| Destination of Energy | APE-COM |
| Historical Maximum discharge(m3/s) | |
| Mean discharge (m3/s) | |
| Historical minimum discharge (m3/s) | |
| Basin area (km2) | |
| maximum operational water level (m) | |
| extreme maximum water level (m) | |
| operational water level (m) | |
| minimum operational water level (m) | |
| Total volume (m3) | 105 millions |
| Net volume (m3) | |
| Length (km) | |
| Surface area at normal condition (km2) | 12.75 |
| Downstream water level(maximum) (m) | |
| Downstream water level(normal) (m) | |
| Downstream water level(minimum) (m) | |
| Height of the spillway outlet (m) | |
| Height of the main dam (m) | 38 |
| Length of the main dam(m) | 637 |
| Vaciemiento máximo / Capacidad de descarge del vertedor (m3/s) | |
| Tipo | |
| Número de Compuertas Total | |
| superfície | |
| Base | |
| Largo (m) | |
| Altura (m) | |
| Cota del tipo de ogiva | |
| Longitud de la cresta (m) | |
| Número de unidades instaladas | 2 |
| Potencial nominal (MW) | 40 |
| Tipo | Klapan |
| Ancho Total (m) | |
| Largo Total (m) | |
| Desnível (m) | |
| Referencia | http://www.cia-brasileira-aluminio.com.br/en/usina_piraju.php |
| Otro información |