| State | Cergueira cesar-SP/ Pirajú-SP |
|---|---|
| River name | Paraná |
| sub-basin name | Paranapanema |
| Company name | DEIGP S/A |
| Latitude | 23°12'35"S |
| Longitude | 49°13'49"W |
| Construction Period | 1956-1962 |
| Total installed power(MW) | 97 |
| Destination of Energy | PIE |
| Historical Maximum discharge(m3/s) | 2,787,00 (06/06/83) |
| Mean discharge (m3/s) | |
| Historical minimum discharge (m3/s) | 5400 |
| Basin area (km2) | 17.8 |
| maximum operational water level (m) | |
| extreme maximum water level (m) | |
| operational water level (m) | 568 |
| minimum operational water level (m) | |
| Total volume (m3) | 6520000000 |
| Net volume (m3) | |
| Length (km) | |
| Surface area at normal condition (km2) | 449 |
| Downstream water level(maximum) (m) | 537.6 |
| Downstream water level(normal) (m) | 536.5 |
| Downstream water level(minimum) (m) | 531 |
| Height of the spillway outlet (m) | |
| Height of the main dam (m) | 50 |
| Length of the main dam(m) | |
| Vaciemiento máximo / Capacidad de descarge del vertedor (m3/s) | |
| Tipo | |
| Número de Compuertas Total | 3 |
| superfície | |
| Base | |
| Largo (m) | 12.5 |
| Altura (m) | |
| Cota del tipo de ogiva | |
| Longitud de la cresta (m) | 46.5 |
| Número de unidades instaladas | |
| Potencial nominal (MW) | |
| Tipo | Kaplan |
| Ancho Total (m) | |
| Largo Total (m) | |
| Desnível (m) | |
| Referencia | Duke Energy Geração Paranapanema. http://www.duke-energy.com |
| Otro información |